Be a nightmare as nothing to screw to if u can fit treated Battons 25mm x 50mm to them opposite direction to the decking every 400mm then screw decking to the battons with 45mm screws leaving a 4/5mm gap inbetween each plank of decking start from the outside so there full planks and work your way into the house then scribe the last piece in